Second Week On-the-Job Training (OJT):
First Day:We went to the field to fix a weak WiFi signal. I helped the technicians carry tools.
Second Day:We repaired a damaged cable in Saguing, Kidapawan. I helped prepare the materials.
Third Day:We replaced a modem in Saguing, Makilala because it had no signal. I helped set up the new modem.
Fourth Day:We installed a new internet connection. I assisted the technicians.
Fifth Day:We checked a slow internet connection. I helped test the signal.
Sixth Day:We visited different areas to fix internet problems. I assisted the technicians during the repairs.
Comments
Post a Comment